Laboratory Design Sampling
QA Lab Design

Complete engineering and detailed design was provided for a Quality Assurance Lab including:
Architectural Services
- Develop lab layout — benches, fume hoods, major free-standing equipment,
flammable storage room, gas bottle storage room, wash-up area
- Fire separation details
- Gas bottle storage fixtures
- Lab bench and fume hood specifications
Mechanical Services
- HVAC design and specification — including general lab ventilation, fume hood exhaust, storage cabinet
exhaust, exhaust for cylinder storage. Overall lab to be a lower pressure than adjacent hallways
and rooms.
- Mechanical services design and specification — including hot and cold city water, specialty gases
distribution [H2, He and Air], natural gas distribution, sink drainage including fume hood cup sinks,
trap priming, grease and glass interceptor to tie point in hallway.
Electrical Services
- Lighting
- Power distribution to lab bench pedestal outlets and
wall-mounted wiremold chase
- Power services to lab equipment
- Data cable distribution and outlet locations, including
adjacent lab offices
- Sensors, detectors and alarms as required by applicable
codes for flammables or asphyxiants
Formulation Development Laboratory HVAC Upgrade
The FD Lab HVAC upgrade work included incorporation of HEPA filters, increase of the corridor and air locks
operating pressure, air balancing of the system after upgrading and incorporation of a new corridor air lock.
A preliminary assessment based on the balancing showed there was just enough air to service the laboratory
and almost none to pressurize the corridor areas. To achieve the objectives, JNE proposed a two-phase
approach to the project. The first phase identified the HVAC upgrade and specified the required equipment. The
second phase prepared a design and bid package complete with drawings suitable for pricing by contractors.
JNE examined the overall capacity of the existing AHU and available space within the plant room with a
view to understanding the current loading for the proposed system upgrading. The work included preparing
fabrication and installation specifications for ductwork complete with additional terminal devices and piping
and electrical design drawings for the equipment installation. Controls for operating the revised HVAC
equipment were also evaluated and specified.
Hazardous Operations (HazOp) Study
A HazOp study was performed for a pharmaceutical expansion including a new analytical laboratory and
support facilities plus other areas as follows:
- Analytical laboratoy
- Walk-in fume hood (in the lab)
- Gas cylinder storage room
- Underground waste solvent tank
- Underground waste drug tank
- Emergency generator
- Inergen fire suppression system and secure
document room
- Domestic hot water & cold water systems
The lab was to be used to perform a variety of analytical tests, predominantly high pressure liquid
chromatography (HPLC), as well as gas chromatography (GC). As with any typical laboratory, a variety of
solvents (of which some are flammable and combustible liquids) and other chemicals (including acids and
bases) would be stored and handled there. |