Dofasco
Phase 1 of five-year expansion

JNE provided basic engineering to define scope, schedule and project estimate for the finishing division
upgrade, followed by multi-discipline construction engineering to support the construction effort. Services
included engineering project management, civil/ structural, electrical, mechanical, piping and HVAC
(building services) and design control.
In addition to the basic engineering and construction engineering efforts, JNE also provided project management
and construction management supporting services including estimating, construction trade coordination,
Quality Assurance/Quality Control (QA/QC)
Phase One of the program consisted of the following:
- Upgrading a pickle line to improve product quality and increase its capacity.
- Upgrading Dofasco’s existing continuous pickling cold rolling mill (No 1 CPCM).
- Constructing a new pickle line to be coupled to an upgraded existing cold rolling mill to create a
second continuous pickling cold rolling mill (No 2 CPCM)
- Replacing the two existing acid regeneration plants, which recycle and
re-condition materials used in the pickling process.
The No. 2 CPCM project involved the installation of a new
continuous pickle line coupled with an existing cold mill.
The work included:
- Rehabilitation of the existing building (structural steel,
cladding, crane girders etc.).
- Installation of new infrastructure (i.e., building
extensions, utility and services upgrades).
- New equipment installation of new pickle line section including strip transfer equipment (foundations,
equipment installation, temporary commissioning arrangement etc.).
- New TCM entry and exit equipment required for coil handling and movement (including foundations,
M/E, existing mill equipment upgrades, etc.).
- New TCM mill stand equipment retrofit for increased throughput.
The new acid regeneration plant replaced the two existing plants with additional capacity. The technology
that has been adopted is a fluidized bed system where the waste pickle liquor is regenerated and returned
to the pickle lines, while the residue is converted into dust-free iron oxide pellets.
Project Value: $384M CDN
|